Dover lays out water supply options in final feasibility study
Thu, 04/02/2026 - 4:00pm
jon.hurdle
Potential scenarios, and costs, for how Dover could approach its water supply over the next decade are distilled in a feasibility study final report, which is available to be read in full via the town’s website. The report, which was posted on March 18, was compiled by Dufresne Group Consulting Engineers, a Vermont-based firm with locations in Springfield, Barre, and St. Johnsbury.

