Bridge repair drags on

Last week, reporter Jon Hurdle reported on the damage and repairs to the Route 9 bridge – Bridge 31 in VTrans parlance – in the center of Wilmington Village. The bridge has been plagued with problems and repairs over the last several years and, when new holes opened up in the bridge deck earlier this year, part of the repairs included a large steel plate embedded on the surface of the bridge. Downtown residents, visitors, and businesses were treated to a nearly nonstop cacophony of tires and steel pounding on concrete and bituminous patch for several months.


Support local journalism. Access to our full website, including e-edition archives, starts at only $2.

Click here to learn more about subscription options.

Are you a current online subscriber? Click to login.

If you have a print subscription, you can now add online access at no additional charge. Just email us with your name and mailing address to set it up.

Thank you for supporting community journalism and The Deerfield Valley News.


 

Recent Posts


Prices for diesel, #2 home heating oil, and gasoline have risen dramatically over the last several months, causing concern for many Vermonters who depend on petroleum products for heating and to power industry.
October 22, 2026

Jon Hurdle A steel beam weighing about 55,000 pounds was slowly lowered into place as part of the new bridge in Readsboro.
October 22, 2026

Photo Mike Eldred
October 22, 2026

The Deerfield Valley News

795 VT Route 100 North
Wilmington, VT 05363

Phone: 802-464-3388

Comment Here